CROWLEY ISD!!! - NEW BUILD
- Previous burnout, originally built in 1988, has been re-built from the ground up in 2023. EVERYTHING IS NEW!!! - Old foundation was busted up and new one repoured. Plumbing and electrical all brand new. Most appliances (microwave, oven/range, fridge, dishwasher, toilets) are there already, new in boxes, and will convey at closing.
- House is about 70% complete and all majors are roughed in. Furnace is already installed in the attic with ducts running throughout the house. It will need insulation in the attic and is at the stage for final finish outs.
New plans suggest 1512 sq ft livable with 400 sq ft covered patio in the back
No outstanding permits as of now and has Passed all inspections up to this point. Now just heading into the final stretch.
Bedrooms | |
Bathrooms | |
Sq. footage |